Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Cables by-passed around landslide
Discussion of work done when Hartford Electric Light Co, by-passed nine 11-kv, 350,000-cir mil lead covered cables after slide in connection with construction of bridge by state highway department across Park River.
Cables by-passed around landslide
Discussion of work done when Hartford Electric Light Co, by-passed nine 11-kv, 350,000-cir mil lead covered cables after slide in connection with construction of bridge by state highway department across Park River.
Cables by-passed around landslide
Elec World
Electrical World ; 118
1942
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Using TDR Cables and GPS for Landslide Monitoring in High Mountain Area
British Library Online Contents | 2009
|Using TDR Cables and GPS for Landslide Monitoring in High Mountain Area
Online Contents | 2009
|Landslide Hazard Zonation Around Bhuntar (Kullu Town), Himachal Pradesh
British Library Online Contents | 2007
|Velocity-dependent local phenomena around an extremely rapid landslide
British Library Conference Proceedings | 1998
|Numerical Modelling of Landslide Generated Tsunamis Around a Conical Island
British Library Conference Proceedings | 2009
|