Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Falsework for arches set on drum gates
Falsework constructed on narrow spillway crest of Grand Coulee Dam to support forms for reinforced concrete highway bridge across top of spillway; at top of bents 38-ft timber cap has its ends supported on brackets to carry overhang outside 21-ft wide bent.
Falsework for arches set on drum gates
Falsework constructed on narrow spillway crest of Grand Coulee Dam to support forms for reinforced concrete highway bridge across top of spillway; at top of bents 38-ft timber cap has its ends supported on brackets to carry overhang outside 21-ft wide bent.
Falsework for arches set on drum gates
Eng News-Rec
Engineering News-Record ; 128
1942
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Travelling falsework for arches on curves
Engineering Index Backfile | 1941
|Long steel arches erected by falsework elevator
Engineering Index Backfile | 1936
Large concrete bridge arches built without falsework
Engineering Index Backfile | 1964
Long steel arches erected by falsework elevator
Engineering Index Backfile | 1936
Three-span falsework trusses convert to tied arches for moving
Engineering Index Backfile | 1955