Hydro-Quebec crew blasts plug to block 50-ft diversion tunnel
New method utilized by Hydro-Quebec at Outardes 4 project; rock plug was shaped above tunnel entrance, then blasted loose so that it fell into mouth of diversion tunnel around dam and closed it; trenches 40 ft deep were excavated along sides of block in 4-ft lifts; trench at back was cut through roof of tunnel; rock bolts inserted from top and bottom were to help cracked rock hold together; arched tunnel is 50 ft in diam; rock plug was to be 70 ft high, 60 ft wide and 60 ft deep, to close mouth of tunnel and cut water flowing through tunnel by 82% or 2700 cfs at time of blast.
Hydro-Quebec crew blasts plug to block 50-ft diversion tunnel
New method utilized by Hydro-Quebec at Outardes 4 project; rock plug was shaped above tunnel entrance, then blasted loose so that it fell into mouth of diversion tunnel around dam and closed it; trenches 40 ft deep were excavated along sides of block in 4-ft lifts; trench at back was cut through roof of tunnel; rock bolts inserted from top and bottom were to help cracked rock hold together; arched tunnel is 50 ft in diam; rock plug was to be 70 ft high, 60 ft wide and 60 ft deep, to close mouth of tunnel and cut water flowing through tunnel by 82% or 2700 cfs at time of blast.
Hydro-Quebec crew blasts plug to block 50-ft diversion tunnel
Eng Contract Rec
Salmins, G. (Autor:in)
1968
6 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Reservoir area diversion tunnel inlet rock plug blasting construction method
Europäisches Patentamt | 2024
|Diversion tunnel plug head exhaust structure and exhaust method thereof
Europäisches Patentamt | 2015
|An artificial ice plug for a hydro tunnel
British Library Conference Proceedings | 1997
|Redefining the Hydro Work Crew
British Library Online Contents | 1997
|Hydro-electric water-diversion tunnels
Engineering Index Backfile | 1930
|