Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Cutoff walls speed subway job in narrow streets
Concrete walls cast by slurry-trench method for subway system in Mexico City are doubled up after excavation with extra walls formed and poured against them; subway is built in dry within walls; double walls with plastic between eliminate seepage; water is confined within banks by electro-osmosis.
Cutoff walls speed subway job in narrow streets
Concrete walls cast by slurry-trench method for subway system in Mexico City are doubled up after excavation with extra walls formed and poured against them; subway is built in dry within walls; double walls with plastic between eliminate seepage; water is confined within banks by electro-osmosis.
Cutoff walls speed subway job in narrow streets
Construction Method Equipment
1968
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Berlin. Subway construction in narrow crooked streets
Engineering Index Backfile | 1928
|Builds cutoff to take traffic from city streets
Engineering Index Backfile | 1933
Engineering Index Backfile | 1965
|Slurry supports cutoff trench walls
Engineering Index Backfile | 1960
Slurry supports cutoff trench walls
Engineering Index Backfile | 1960