Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
New shopping centre in schwenningen on neckar (Germany)
Information on construction details of shopping center and on solution of problems involved with traffic and site conditions; construction method chosen for four-story block consisted of prestressed, precast, hollow floor slabs and steel stanchions on grid of 8.40 × 8.40 m; section of building which carries multistory tower is constructed exclusively with prefabricated components; structural characteristics are presented.
New shopping centre in schwenningen on neckar (Germany)
Information on construction details of shopping center and on solution of problems involved with traffic and site conditions; construction method chosen for four-story block consisted of prestressed, precast, hollow floor slabs and steel stanchions on grid of 8.40 × 8.40 m; section of building which carries multistory tower is constructed exclusively with prefabricated components; structural characteristics are presented.
New shopping centre in schwenningen on neckar (Germany)
Acier-Stahl-Steel
Steinich, K. (Autor:in)
Acier-Stahl-Steel ; 33
1968
7 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
50 Jahre Schlacht- und Viehhof Schwenningen am Neckar
TIBKAT | 1966
|Online Contents | 2009
|