Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Tunnel and power-house excavation at Kemano, B.C., for alcan hydro power
Excavation and driving methods in construction of 10-mi 25-ft horseshoe tunnel, two penstocks that plunge down deep inside at angle of 48° from horizontal, powerhouse cavern 120 ft high, 80 ft wide and 700 ft long, and access tunnels; geology of region; information on mechanized equipment and performance. (See also Can Min and Met Bul v 46 n 498 Oct 1953 p 603-21)
Tunnel and power-house excavation at Kemano, B.C., for alcan hydro power
Excavation and driving methods in construction of 10-mi 25-ft horseshoe tunnel, two penstocks that plunge down deep inside at angle of 48° from horizontal, powerhouse cavern 120 ft high, 80 ft wide and 700 ft long, and access tunnels; geology of region; information on mechanized equipment and performance. (See also Can Min and Met Bul v 46 n 498 Oct 1953 p 603-21)
Tunnel and power-house excavation at Kemano, B.C., for alcan hydro power
Western Miner
Matthias, F.T. (Autor:in) / Abrahamson, C.W. (Autor:in)
Western Miner ; 27
1954
11 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Tunnel and power-house excavation at Kemano, B.C., for alcan hydro power
Engineering Index Backfile | 1953
|Kemano tunnel repairs -- Final report
Engineering Index Backfile | 1962
|Inspection of the Tunnel at the Kemano Project
British Library Online Contents | 2013
|Nechako-Kemano-Kitimat project
Engineering Index Backfile | 1952
|Project: Kemano Completion Project
Online Contents | 1994