Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Power to pay for Brazos river development
Projects planned by Corps of Engineers on lower Brazos, Tex, have primary function of flood control and will also provide power and conservation storage; three proposed dams will be approximately 80 ft high, of earth fill type; drainage areas are 13,560, 14,035 and 16,410 sq mi, respectively; total primary energy is estimated to be 116,000,000 kw-hr; all plants are centrally controlled.
Power to pay for Brazos river development
Projects planned by Corps of Engineers on lower Brazos, Tex, have primary function of flood control and will also provide power and conservation storage; three proposed dams will be approximately 80 ft high, of earth fill type; drainage areas are 13,560, 14,035 and 16,410 sq mi, respectively; total primary energy is estimated to be 116,000,000 kw-hr; all plants are centrally controlled.
Power to pay for Brazos river development
Civ Eng (NY)
Marks, III, C.R. (Autor:in)
Civil Engineering ; 21
1951
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1931
|Harbor improvement of Brazos River
Engineering Index Backfile | 1891
|Harbor improvement of Brazos River
Engineering Index Backfile | 1892
|The Brazos River Harbor Improvement
ASCE | 2021
|Discussion on Brazos River Harbor Improvement
ASCE | 2021
|