Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Summer stripping and winter loading coordinated to meet winter water problems at Tono mine, Centralia, Wash; efficient underground recovery of old pillars based on special scraper units and semi-longwall; screening, hand picking and crushing.
Summer stripping and winter loading coordinated to meet winter water problems at Tono mine, Centralia, Wash; efficient underground recovery of old pillars based on special scraper units and semi-longwall; screening, hand picking and crushing.
Stripping waterlogged valleys
Coal Age
Crane, W.E. (Autor:in)
Coal Age ; 56
1951
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Building foundations in waterlogged soil
Engineering Index Backfile | 1930
|Artificial methods of stabilizing waterlogged friable rocks
Engineering Index Backfile | 1964
|Interseasonal Irrigation System Planning for Waterlogged Sodic Soils
British Library Online Contents | 1996
|The Current Scholarship on the Conservation of Waterlogged Textiles
British Library Conference Proceedings | 1989
|