Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
First bridge of prestressed concrete
In pedestrian bridge across Arroyo Seco channel in Los Angeles, two prestressed concrete girders were precast, lifted and moved into place on prepared abutments, where they will constitute simple span of 110 ft and will carry walking slab 8 ft in width; data on prestressing, grouting procedure and moving girders. (see also Western Construction v 25 n 12 Dec 1950 p 67-9, v 26 n 4 Apr 1951 p 76-7)
First bridge of prestressed concrete
In pedestrian bridge across Arroyo Seco channel in Los Angeles, two prestressed concrete girders were precast, lifted and moved into place on prepared abutments, where they will constitute simple span of 110 ft and will carry walking slab 8 ft in width; data on prestressing, grouting procedure and moving girders. (see also Western Construction v 25 n 12 Dec 1950 p 67-9, v 26 n 4 Apr 1951 p 76-7)
First bridge of prestressed concrete
Engineer
Engineer ; 191
1951
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
First bridge of prestressed concrete
Engineering Index Backfile | 1951
Maryland begins first prestressed concrete bridge
Engineering Index Backfile | 1953
Maryland begins first prestressed concrete bridge
Engineering Index Backfile | 1953
First prestressed concrete bridge in Ireland
Engineering Index Backfile | 1956
Maryland begins first prestressed concrete bridge
Engineering Index Backfile | 1953