Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Cast-in-place concrete bridge beams prestressed
750-ft long concrete highway bridge incorporating 59-ft prestressed span across San Bernard River, Tex, will have 24 reinforced concrete spans 30 ft long besides prestressed span; each span consists of nine T-beams spaced 3 ft center to center of webs; superstructure for 59-ft span estimated to cost $168 per lin ft.
Cast-in-place concrete bridge beams prestressed
750-ft long concrete highway bridge incorporating 59-ft prestressed span across San Bernard River, Tex, will have 24 reinforced concrete spans 30 ft long besides prestressed span; each span consists of nine T-beams spaced 3 ft center to center of webs; superstructure for 59-ft span estimated to cost $168 per lin ft.
Cast-in-place concrete bridge beams prestressed
Eng News-Rec
Engineering News-Record ; 147
1951
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Standard bridge beams in prestressed concrete
Engineering Index Backfile | 1960
Prestressed concrete wins place in Massachusetts bridge program
Engineering Index Backfile | 1953
|Prestressed concrete wins place in Massachusetts bridge program
Engineering Index Backfile | 1953
|Concrete Roadside Barrier Anchorage Details for 5-in., Cast-in-Place Decks on Prestressed Beams
British Library Online Contents | 2012
|