Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Caisson takes guess out of pile repairs
Bridge improvement at Easton, Md, was achieved by caisson that surrounded pile, enabling encasement repairs in the dry; caisson consisting of two buoyant halves that clamp together is sealed so that no water can enter.
Caisson takes guess out of pile repairs
Bridge improvement at Easton, Md, was achieved by caisson that surrounded pile, enabling encasement repairs in the dry; caisson consisting of two buoyant halves that clamp together is sealed so that no water can enter.
Caisson takes guess out of pile repairs
Eng News-Rec
Glassgold, I.L. (Autor:in)
Engineering News-Record ; 147
1951
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
CONSTRUCTION METHOD OF CAISSON TYPE PILE AND CAISSON TYPE PILE
Europäisches Patentamt | 2017
|Engineering Index Backfile | 1967
|