Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Illustrated description of construction of concrete piers for double track railroad bridge crossing Cumberland river at Burnside, Ky; slip form consists of 1 × 4-in. tongue and groove timber, 4 ft long, backed by two rings of triple 2 × 8 in. wales; screw jacks used to raise slip form. For description of bridge see references under Bridges, Steel Truss -- Burnside, Ky.
Illustrated description of construction of concrete piers for double track railroad bridge crossing Cumberland river at Burnside, Ky; slip form consists of 1 × 4-in. tongue and groove timber, 4 ft long, backed by two rings of triple 2 × 8 in. wales; screw jacks used to raise slip form. For description of bridge see references under Bridges, Steel Truss -- Burnside, Ky.
Slip forms reduce cost of tall bridge piers
Civ Eng (NY)
Holt, R. (Autor:in)
Civil Engineering ; 20
1950
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1956
Design of tall bridge piers by ant colony optimization
Elsevier | 2011
|Design of tall bridge piers by ant colony optimization
Online Contents | 2011
|Rational analysis model and seismic behaviour of tall bridge piers
British Library Online Contents | 2014
|Shop-fabricated forms build bridge piers
Engineering Index Backfile | 1947