Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Illustrations, diagrams and description of how Studebaker broke serious power bottleneck at its South Bend plant by boosting distribution voltage to 13.2 kv and rehabilitating its electrical system.
Illustrations, diagrams and description of how Studebaker broke serious power bottleneck at its South Bend plant by boosting distribution voltage to 13.2 kv and rehabilitating its electrical system.
Rewiring at Studebaker
Elec Construction Maintenance
Morehouse, E.G. (Autor:in)
1951
7 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Some details of Studebaker cars
Engineering Index Backfile | 1913
The automobile manufacturing plant of the studebaker corporation at South Bend, Indiana
Engineering Index Backfile | 1920
Engineering Index Backfile | 1956
|A Lesson in Communications Rewiring
Online Contents | 1997