Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Speeding up the Moffat tunnel
New cantilever beam cuts time in half, saves labor costs, and prevents disastrous slides.
Speeding up the Moffat tunnel
New cantilever beam cuts time in half, saves labor costs, and prevents disastrous slides.
Speeding up the Moffat tunnel
Sci. Am
Scientific American ; 137
1927
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1927
Unanticipated Benefits: The Moffat Tunnel
ASCE | 2019
|Concreting operations on Moffat water tunnel
Engineering Index Backfile | 1936
|Construction of the Moffat tunnel
Engineering Index Backfile | 1928
|Completion of Moffat tunnel of Colorado
Engineering Index Backfile | 1930
|