Description of natural conditions and design of two independent lock chambers 225 m. by 12 m. by 3 m. deep; dredging and excavation methods for removal of nearly 2.2 million cu. m.; concreting plant, concrete distribution and pouring, laying of reinforcing bars. (See also - no. 27 July 6 pp. 331-334, no. 28 July 13 pp. 348-352)
Description of natural conditions and design of two independent lock chambers 225 m. by 12 m. by 3 m. deep; dredging and excavation methods for removal of nearly 2.2 million cu. m.; concreting plant, concrete distribution and pouring, laying of reinforcing bars. (See also - no. 27 July 6 pp. 331-334, no. 28 July 13 pp. 348-352)
Construction plant for the building of the anderten locks
Die Betriebseinrichtungen fur den Bau der Schleusen bei Anderten
1927
3 pages
16 Figs.
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.
The Mittelland canal and the Anderten locks
Engineering Index Backfile | 1930
Anderten Locks on the Mitelland Canal Near Hannover
Engineering Index Backfile | 1930
Hindenburg locks of the Mittelland canal at Anderten
Engineering Index Backfile | 1928
|Hindenburg locks of the Mittelland canal at Anderten