Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Concrete work in the construction of the new lock at ijmuiden
Details of form, work and method of distributing concrete by means of tower-and-boom system; about 60,000 cu. yd. of concrete were poured.
Concrete work in the construction of the new lock at ijmuiden
Details of form, work and method of distributing concrete by means of tower-and-boom system; about 60,000 cu. yd. of concrete were poured.
Concrete work in the construction of the new lock at ijmuiden
Het gietbetonbedrijf in uitvoering bij den bouw der nieuwe sluis te Ijmuiden
Peiser, B. (Autor:in)
Ingenieur ; 42
1927
4 pages
4 Figs.
Aufsatz (Zeitschrift)
Niederländisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction of the new tide lock at Ijmuiden
Engineering Index Backfile | 1925
|Online Contents | 1994
mischerzpelletierung in ijmuiden
Tema Archiv | 1972
|Concrete mixing plant for construction of new drainage culverts in Ijmuiden, Netherlands
Engineering Index Backfile | 1941