Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of concrete breakwater
Structure in Lake Erie which protects entrance to Welland Ship Canal at Port Colborne, Ont., is 2000 ft. long and is composed of 20 concrete cribs; cribs are filled with dredged rock and have concrete superstructure.
Construction of concrete breakwater
Structure in Lake Erie which protects entrance to Welland Ship Canal at Port Colborne, Ont., is 2000 ft. long and is composed of 20 concrete cribs; cribs are filled with dredged rock and have concrete superstructure.
Construction of concrete breakwater
Can. Engr
Canadian Engineer ; 52
1927
2 pages
4 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Concrete caissons for breakwater construction
Engineering Index Backfile | 1920
|Concrete caissons for breakwater construction
Engineering Index Backfile | 1920
|Concrete breakwater construction of Buffalo, New York
Engineering Index Backfile | 1902
|Prestressed concrete simplifies construction of breakwater/wharf
Engineering Index Backfile | 1969
|