Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Railway bridges at Konigsberg, Stettin, Frankfort on Oder, Hamerten, Weener, Hochzoll, Meissen, Alton (four-track), Rathenow, Potsdam, Guls, Cu strin, and Breslau; railway stations of Frankfort-on-the-Oder, and two stations in Berlin; strengthening superstructures of Mittweida viaduct and Oder bridge at Frankfort; reviews progress in making of special steels.
Railway bridges at Konigsberg, Stettin, Frankfort on Oder, Hamerten, Weener, Hochzoll, Meissen, Alton (four-track), Rathenow, Potsdam, Guls, Cu strin, and Breslau; railway stations of Frankfort-on-the-Oder, and two stations in Berlin; strengthening superstructures of Mittweida viaduct and Oder bridge at Frankfort; reviews progress in making of special steels.
Bridge and building construction in Germany in 1926
Der Bruckenbau und der Ingenieurhochbau im Jahre 1926
Schaper (Autor:in)
Bautechnik ; 5
1927
7 pages
21 Figs.
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.
Bridge building by the German Railway Company during 1924-1926
Engineering Index Backfile | 1926
|Engineering Index Backfile | 1927
Bridge building and engineering construction by railroad administration of Germany in 1930
Engineering Index Backfile | 1931
|The art of bridge building in Germany
Engineering Index Backfile | 1925
|