Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Last extension to rubble mound breakwater at main harbor north is 2000 ft. long, 14 ft. wide at top and 30 ft. at water line; core of quarry run stone with covering courses of large trap rock.
Last extension to rubble mound breakwater at main harbor north is 2000 ft. long, 14 ft. wide at top and 30 ft. at water line; core of quarry run stone with covering courses of large trap rock.
Breakwater extension at Port Arthur
Can. Engr
Harcourt, F.Y. (Autor:in)
Canadian Engineer ; 53
1927
4 pages
7 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Port Arthur harbor breakwater construction
Engineering Index Backfile | 1931
Breakwater construction in Port Arthur harbour
Engineering Index Backfile | 1931
|Breakwater construction in Port Arthur harbour
Engineering Index Backfile | 1931
|Extension to the Port of Tarragona breakwater, Spain
British Library Online Contents | 2010
|