Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Concrete cribs for breakwater and dockage
Marine construction methods on new Welland Canal; floating-pontoon system of construction; stripping and reassembling.
Concrete cribs for breakwater and dockage
Marine construction methods on new Welland Canal; floating-pontoon system of construction; stripping and reassembling.
Concrete cribs for breakwater and dockage
Port Terminal
Tromanhauser, J.H. (Autor:in)
1927
3 pages
6 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Design and construction of reinforced concrete cribs for harbour breakwater
Engineering Index Backfile | 1945
|Some notes on breakwater construction of timber cribs and concrete superstructure
Engineering Index Backfile | 1912
|Concrete cribs form emergency seawall
Engineering Index Backfile | 1949
|Concrete cribs for wharves and breakwaters
Engineering Index Backfile | 1926