Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Bristol Regional Foul Water Drainage Scheme
Scheme comprises about 25 mi of new trunk sewers and new sewage treatment works superseding five existing works in outlying areas; historical background and overall design of scheme is described, followed by descriptions of principal features of new main sewage system; these include design and construction of sewers in tunnel and open cut, pumping stations, inverted and true siphons, large scale pipe jacking and effluent outfall; mention is made of principal features of sewage treatment works, which include power generation from sludge gas, sea disposal of digested sludge and use of effluent for industrial purposes.
Bristol Regional Foul Water Drainage Scheme
Scheme comprises about 25 mi of new trunk sewers and new sewage treatment works superseding five existing works in outlying areas; historical background and overall design of scheme is described, followed by descriptions of principal features of new main sewage system; these include design and construction of sewers in tunnel and open cut, pumping stations, inverted and true siphons, large scale pipe jacking and effluent outfall; mention is made of principal features of sewage treatment works, which include power generation from sludge gas, sea disposal of digested sludge and use of effluent for industrial purposes.
Bristol Regional Foul Water Drainage Scheme
Instn Civ Engrs -- Proc
Steel, P.H. (Autor:in)
1967
26 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1947
|Fair Is Foul, and Foul Is Fair
Taylor & Francis Verlag | 1975
|