Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Evaluation of construction control procedures -- Interim report
Report deals with study of sampling and test procedures for determining gradation of aggregates to be used in highway construction; definite recommendations are made for incorporating results of this study into highway construction specifications and procedures to provide basis for acceptance and rejection of aggregates; these include major items of point and method of sampling, minimum sample weight and number of test increments, and graduated penalty system for noncompliance; model specification illustrating method of incorporating foregoing considerations has been drafted and is included.
Evaluation of construction control procedures -- Interim report
Report deals with study of sampling and test procedures for determining gradation of aggregates to be used in highway construction; definite recommendations are made for incorporating results of this study into highway construction specifications and procedures to provide basis for acceptance and rejection of aggregates; these include major items of point and method of sampling, minimum sample weight and number of test increments, and graduated penalty system for noncompliance; model specification illustrating method of incorporating foregoing considerations has been drafted and is included.
Evaluation of construction control procedures -- Interim report
Nat Research Council -- Nat Cooperative Highway Research Program Report
1967
117 pages
Report
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Evaluation of construction control procedures : interim report
TIBKAT | 1967
|Sacramento Hydrologic Procedures, Interim Adoption
British Library Conference Proceedings | 1993
|Interim Procedures for Pressure Flow Scour
British Library Conference Proceedings | 1999
|Evaluation of Modified Asphalt Binders (Interim Report)
NTIS | 1989
|