Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Aim of river basin project is to create uniform water surface level for whole region of city of Lyon, permitting establishment of connection between inland waterway of Rhone, which is being extended to Mediterranean sea, with that of Saone with its future connection with Rhine; detailed description of work on storage dam, dikes, drainage system, hydroelectric plant, discharge channel, canal lock, dragging operations.
Aim of river basin project is to create uniform water surface level for whole region of city of Lyon, permitting establishment of connection between inland waterway of Rhone, which is being extended to Mediterranean sea, with that of Saone with its future connection with Rhine; detailed description of work on storage dam, dikes, drainage system, hydroelectric plant, discharge channel, canal lock, dragging operations.
Pierre-Benite fall on Rhone
La chute de Pierre-Benite sur le Rhone
Gemaehling, C. (Autor:in)
1967
22 pages
Aufsatz (Zeitschrift)
Französisch
© Metadata Copyright Elsevier B. V. All rights reserved.
The rehabilitation of the old course of the Rhone river (Pierre Benite)
British Library Conference Proceedings | 1998
|Upstream bridge over Rhone River at Pierre-Be´
Engineering Index Backfile | 1966
|The rehabilitation of the Old Rhône of Pierre-Bénite
Online Contents | 2000
|The rehabilitation of the Old Rhone of Pierre-Benite
British Library Online Contents | 2000
|Harnessing Bourg-les-Valences fall on Rhone river
Engineering Index Backfile | 1967
|