Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Displacement of adjacent roadway and ground surface during construction period of open caisson
Report deals with methods and results of displacement observation, carried out to estimate degree of danger for traffic, during construction period of open caisson pier foundation to be constructed very close to existing road embankment on weak strata; results of observation confirmed that protection method by sheet piling was effective and in this case displacements or strains were too small to disturb track or to interrupt traffic.
Displacement of adjacent roadway and ground surface during construction period of open caisson
Report deals with methods and results of displacement observation, carried out to estimate degree of danger for traffic, during construction period of open caisson pier foundation to be constructed very close to existing road embankment on weak strata; results of observation confirmed that protection method by sheet piling was effective and in this case displacements or strains were too small to disturb track or to interrupt traffic.
Displacement of adjacent roadway and ground surface during construction period of open caisson
Tokyo. Ry Tech Research Inst -- Quarterly Report
Muromachi, T. (Autor:in) / Komine, T. (Autor:in) / Yasuda, Y. (Autor:in)
1967
4 pages
Report
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Open caisson construction method and open caisson structure
Europäisches Patentamt | 2020
|Open caisson structure and open caisson construction method
Europäisches Patentamt | 2020
|Open caisson construction method and open caisson structure
Europäisches Patentamt | 2023
|Open caisson construction auxiliary device and open caisson construction method
Europäisches Patentamt | 2023
|Open caisson guiding structure and open caisson construction method
Europäisches Patentamt | 2024
|