Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction progress of the hetch hetchy water supply of San Francisco California
General description of project; construction work completed and in progress; Hetch Hetchy railroad; lower Cherry power system; Hetch Hetchy and Lake Eleanor dams; aqueduct tunnel. Expenditures to Jan. 1, 1922, about $14,000,000. (See also Discussion in no. 5, May 1922, pp. 1305-1310)
Construction progress of the hetch hetchy water supply of San Francisco California
General description of project; construction work completed and in progress; Hetch Hetchy railroad; lower Cherry power system; Hetch Hetchy and Lake Eleanor dams; aqueduct tunnel. Expenditures to Jan. 1, 1922, about $14,000,000. (See also Discussion in no. 5, May 1922, pp. 1305-1310)
Construction progress of the hetch hetchy water supply of San Francisco California
Am. Soc. Civ. Engrs. Proc
O'Shaughnessy, M.M. (Autor:in)
1922
27 pages
10 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Hetch hetchy water supply project, San Francisco
Engineering Index Backfile | 1928
|Hetch Hetchy water supply project for San Francisco
Engineering Index Backfile | 1927
|Hetch Hetchy tunnel construction
Engineering Index Backfile | 1931
San Francisco's Hetch hetchy water supply
Engineering Index Backfile | 1922
|