Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Method of constructing 8 ft. tunnel through water-bearing strata
Describes construction of tunnel by which aqueduct of Birkenhead Corporation passes under River Dee. Notes on tidal influence, method of excavating, rate of tunneling, etc.
Method of constructing 8 ft. tunnel through water-bearing strata
Describes construction of tunnel by which aqueduct of Birkenhead Corporation passes under River Dee. Notes on tidal influence, method of excavating, rate of tunneling, etc.
Method of constructing 8 ft. tunnel through water-bearing strata
Eng. Contracting
Baker, R.F. (Autor:in)
1921
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Drainage method of the Maiko Tunnel in water-bearing gravel strata
British Library Conference Proceedings | 1998
|Shaft sinking through water-bearing strata, near Dortmund
Engineering Index Backfile
The cementing of shafts sunk through water bearing strata
Engineering Index Backfile | 1906
|British Library Conference Proceedings | 2007
|Underground water-bearing strata and their utilization
Engineering Index Backfile | 1943
|