Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Driving a 20,000 sec. ft. flood protection tunnel
Turkey Creek diversion works at Kansas City includes 28 by 28-ft. tunnel through bedrock requiring grade change. Shovels are driven. Machine-mixed concrete placed by air.
Driving a 20,000 sec. ft. flood protection tunnel
Turkey Creek diversion works at Kansas City includes 28 by 28-ft. tunnel through bedrock requiring grade change. Shovels are driven. Machine-mixed concrete placed by air.
Driving a 20,000 sec. ft. flood protection tunnel
Eng. News-Rec
1921
5 pages
7 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Mahr tunnel encounters 20,000-G.P.M. flow
Engineering Index Backfile | 1933
TIBKAT | 2016
|Engineering Index Backfile | 1928
|Grossbunkeranlage fuer 20,000 t Kohle
Engineering Index Backfile | 1932
|Large Storm Relief Tunnel for Basement Flood Protection
British Library Conference Proceedings | 1995
|