Construction of Franklin highway
Pub. Works
Sauerman, E.H. (Autor:in)
Public Works ; 52
1922
2 pages
14 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
First unit of reconstruction on Franklin canyon highway completed