Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Gilboa dam construction
Mar 25 1922 n 12 p 205-208: Exploration boring pressure tests, river diversion, foundations, excavations and installation of contractor's plant. Apr. 29 1922 n 17 p 295-297: Quarries, sand pits, washings and screenings, concrete mixing and placing. May 6 n 18 p 319-321 6 figs.: Steenkill dike and appurtenances; foundation, excavation, control channel, steam-shovel and belt-conveyor work for large embankment, bypass pipes and flume, repairing culvert and paving slope.
Gilboa dam construction
Mar 25 1922 n 12 p 205-208: Exploration boring pressure tests, river diversion, foundations, excavations and installation of contractor's plant. Apr. 29 1922 n 17 p 295-297: Quarries, sand pits, washings and screenings, concrete mixing and placing. May 6 n 18 p 319-321 6 figs.: Steenkill dike and appurtenances; foundation, excavation, control channel, steam-shovel and belt-conveyor work for large embankment, bypass pipes and flume, repairing culvert and paving slope.
Gilboa dam construction
Pub. Works
Public Works ; 52
1922
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1921
Real Time Piezometric Level Monitoring at Blenheim-Gilboa
British Library Conference Proceedings | 1998
|Discussion on Experiments with Models of Gilboa Dam
ASCE | 2021
|Experiments with Models of the Gilboa Dam and Spillway
ASCE | 2021
|Experiments with models of the gilboa dam and spillway
Engineering Index Backfile | 1922
|