Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The deep core-wall of the Wanaque dam
Method adopted for constructing core wall was to drive two walls of steel sheet piling across valley, excavate between them, meanwhile bracing steel sheeting with timber, and then filling trench with concrete.
The deep core-wall of the Wanaque dam
Method adopted for constructing core wall was to drive two walls of steel sheet piling across valley, excavate between them, meanwhile bracing steel sheeting with timber, and then filling trench with concrete.
The deep core-wall of the Wanaque dam
N. E. Water Works Assn., Jl
Pratt, Arthur H. (Autor:in)
1922
10 pages
10 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1921
Construction of Wanaque dam near Paterson, N. J.
Engineering Index Backfile | 1929
|Driving Wanaque tunnel for North Jersey water supply
Engineering Index Backfile | 1925
Great notch tunnel and approaches of the Wanaque project
Engineering Index Backfile | 1923
|