Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Detailed description of various types of steam and electric cranes, especially for harbor use, including floating cranes up to 250 tons lifting capacity.
Detailed description of various types of steam and electric cranes, especially for harbor use, including floating cranes up to 250 tons lifting capacity.
50 Years of crane construction in the Ruhr district
50 Jahre Ingenieurarbeit des Ruhrbezirks im Hafenkranbau der Welt
1922
5 pages
21 Figs.
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.
Sorpetal weir in Ruhr district
Engineering Index Backfile | 1936
|Socio-political motives in Ruhr district nature conservation 80 years ago
Online Contents | 1995
|Significance of dam construction for water supply of Ruhr district in Germany
Engineering Index Backfile | 1936
|The aerial survey of the Ruhr coal mining district
Engineering Index Backfile | 1927
|A nature protecton management program for the ruhr district
Online Contents | 1995
|