Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Pouring 1600 cu yards of concrete per day
Average of 100 yd. per hr. has been maintained on Hetch Hetchy dam.
Pouring 1600 cu yards of concrete per day
Average of 100 yd. per hr. has been maintained on Hetch Hetchy dam.
Pouring 1600 cu yards of concrete per day
Contract Rec
Contract Record ; 36
1922
4 pages
1 Fig.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Concrete pouring formwork and concrete pouring method
Europäisches Patentamt | 2023
|Million yards concrete for dam
Engineering Index Backfile | 1943
Formwork structure for concrete pouring and concrete pouring method
Europäisches Patentamt | 2021
|Underwater concrete pouring device and underwater concrete pouring method
Europäisches Patentamt | 2024
|