Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction methods and plant on the Marseilles lock
Construction problems in building lock of new Illinois waterway near Lockport, Ill. River between mixer and lock crossed by cableway, movable bridge and ferry boats; excavation kept just ahead of concrete to avoid disintegration of shale foundation.
Construction methods and plant on the Marseilles lock
Construction problems in building lock of new Illinois waterway near Lockport, Ill. River between mixer and lock crossed by cableway, movable bridge and ferry boats; excavation kept just ahead of concrete to avoid disintegration of shale foundation.
Construction methods and plant on the Marseilles lock
Eng. News-Rec
1922
4 pages
6 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction operation on the Marseilles lock of the Illinois waterway
Engineering Index Backfile | 1921
Online Contents | 2004
British Library Online Contents | 2000
|