Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Building the Rondout Creek highway suspension bridge
Concrete-floor highway bridge of 705-ft. span; stiffening trusses continuous over three spans; method of spinning 9 3/4-in. wire cables.
Building the Rondout Creek highway suspension bridge
Concrete-floor highway bridge of 705-ft. span; stiffening trusses continuous over three spans; method of spinning 9 3/4-in. wire cables.
Building the Rondout Creek highway suspension bridge
Eng. News-Rec
Joyce, W.E. (Autor:in) / Bebarfald, M. (Autor:in)
1922
5 pages
7 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
The new highland creek highway bridge
Engineering Index Backfile | 1922
|Highway bridge over Sunday creek, Seymour, Vic.
Engineering Index Backfile | 1930
|Hagwilet highway suspension bridge
Engineering Index Backfile | 1932
|Engineering Index Backfile | 1935
|Engineering Index Backfile | 1898
|