Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Pier construction, Wells St. bridge (Chicago)
Large water-tight concrete tail pits for long double-deck bascule span built in cofferdams enclosing multiple deep cylindrical foundation piers sheeted down by Chicago well process.
Pier construction, Wells St. bridge (Chicago)
Large water-tight concrete tail pits for long double-deck bascule span built in cofferdams enclosing multiple deep cylindrical foundation piers sheeted down by Chicago well process.
Pier construction, Wells St. bridge (Chicago)
Pub. Works
Public Works ; 53
1922
3 pages
3 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
PIER, PIER CONSTRUCTION METHOD, BRIDGE RECONSTRUCTION METHOD AND BRIDGE CONSTRUCTION METHOD
Europäisches Patentamt | 2021
|