Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Hoes, clams dig tricky trench
10,000 ft of trench for 54-in. cast iron water pipe in Milwaukee, Wis, were dug with clamshells, small truck-mounted Hydrocranes, and Hydrohoe, due to space limitations; pipe was laid in place at rate of almost eight 12-ft sections per day; illustrated description of work.
Hoes, clams dig tricky trench
10,000 ft of trench for 54-in. cast iron water pipe in Milwaukee, Wis, were dug with clamshells, small truck-mounted Hydrocranes, and Hydrohoe, due to space limitations; pipe was laid in place at rate of almost eight 12-ft sections per day; illustrated description of work.
Hoes, clams dig tricky trench
Excavating Engr
Excavating Engineer ; 47
1953
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 2007
|British Library Online Contents | 2007
|PRODUCT - Kunstof hoes Slopie houdt puin in container
Online Contents | 2008
British Library Online Contents | 2010
|British Library Online Contents | 2004
|