Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Methods used in lining 435-ft Gaviota Gorge Tunnel, link in 8.3-m highway in Santa Barbara County, Calif; lining is 18 to 36 in. thick; steel lining form consists of crown section and two side panel sections; form was moved along 4.47% roadway grade by means of pulley system; concrete was discharged from mixer to pump concrete machine. (See also Roads and Streets v 96 n 10 Oct 1953 p 53-56)
Methods used in lining 435-ft Gaviota Gorge Tunnel, link in 8.3-m highway in Santa Barbara County, Calif; lining is 18 to 36 in. thick; steel lining form consists of crown section and two side panel sections; form was moved along 4.47% roadway grade by means of pulley system; concrete was discharged from mixer to pump concrete machine. (See also Roads and Streets v 96 n 10 Oct 1953 p 53-56)
Lining methods at Gaviota Tunnel
Western Construction
Witte, J.E. (Autor:in)
Western Construction ; 28
1953
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Modern methods of tunnel lining
Engineering Index Backfile | 1941
|Lining methods at Gaviota Tunnel
Engineering Index Backfile | 1953
|Wiley | 2012
|Wiley | 2008
|Tunnel lining methods for concrete compared
Engineering Index Backfile | 1940
|