Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Methods and equipment for soil-cement paving
Adequate cement content, proper moisture content, and proper, uniform density govern success of soil cement pavement; "soil" includes wide range of materials; good gradation is not needed but maximum size of stone should not exceed 3-in. diam; moisture density tests, standard wet-dry and freeze-thaw tests are conducted before paving; construction equipment, and work procedure with scarifying, pulverizing, spreading cement, dry mixing, damp mixing and compacting described.
Methods and equipment for soil-cement paving
Adequate cement content, proper moisture content, and proper, uniform density govern success of soil cement pavement; "soil" includes wide range of materials; good gradation is not needed but maximum size of stone should not exceed 3-in. diam; moisture density tests, standard wet-dry and freeze-thaw tests are conducted before paving; construction equipment, and work procedure with scarifying, pulverizing, spreading cement, dry mixing, damp mixing and compacting described.
Methods and equipment for soil-cement paving
Pub Works
Public Works ; 84
1953
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1945
|Engineering Index Backfile | 1943
Engineering Index Backfile | 1947
|Engineering Index Backfile | 1943
Engineering Index Backfile | 1943