Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Divert stream over dam under construction
During construction of Blakely Mountain earthdam, 230 ft high, near Hot Springs, Ark, tunnels which will carry water to turbines and discharge flood water, were extended temporarily and used as stream diversion outlet; when embankment was completed diversion tunnels were closed with gates.
Divert stream over dam under construction
During construction of Blakely Mountain earthdam, 230 ft high, near Hot Springs, Ark, tunnels which will carry water to turbines and discharge flood water, were extended temporarily and used as stream diversion outlet; when embankment was completed diversion tunnels were closed with gates.
Divert stream over dam under construction
Construction methods Equipment
Stephens, J.R. (Autor:in)
1953
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Des Joachims dam builders deftly divert Ottawa River
Engineering Index Backfile | 1949
Cut-and-Cover conduits divert Niagara water
Engineering Index Backfile | 1959
O protect the planet, divert traffic to rail
IuD Bahn | 2007
|Metering Ramps to Divert Traffic Around Bottlenecks: Some Elementary Theory
British Library Online Contents | 2005
|Twin 90-in. Concrete pipelines divert storm runoff for Paducah, Ky.
Engineering Index Backfile | 1954
|