Precast cribs used for Pugsley Wharf in Saint John
880-ft extension of timber wharf at Pugsley terminal in St. John, NB; eight reinforced concrete cribs for extension were poured in Courtenay Bay drydocks and floated out and towed to wharf site; all cribs are 48-ft wide and 110-ft long; each crib is divided into six bulkheaded compartments fitted with sinking valves.
Precast cribs used for Pugsley Wharf in Saint John
880-ft extension of timber wharf at Pugsley terminal in St. John, NB; eight reinforced concrete cribs for extension were poured in Courtenay Bay drydocks and floated out and towed to wharf site; all cribs are 48-ft wide and 110-ft long; each crib is divided into six bulkheaded compartments fitted with sinking valves.
Precast cribs used for Pugsley Wharf in Saint John
Eng Contract Rec
Koenig, J. (Autor:in)
1953
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Concrete and timber cribs accurately placed for Vancouver Wharf
Engineering Index Backfile | 1916
|Precast cylinders support new Wharf
Engineering Index Backfile | 1939
Discussion of “Pugsley on Dynamic Instability”
ASCE | 2021
|Precast concrete cylinders support new wharf
Engineering Index Backfile | 1936
Precast concrete in Canal zone wharf
Engineering Index Backfile | 1936
|