Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Design saves construction dollars on contra costa power plant
Plant, with 575,000-kw capacity is on south bank of San Joaquin River, 40 mi from San Francisco, Calif; ground water required construction of well points; structure is supported on spread footings and, in special cases, on piles; appreciable cost saving by design of cellular substructure of turbine room to permit use of big equipment and simple construction methods, and use of set of pre-used steel forms for intake tubes.
Design saves construction dollars on contra costa power plant
Plant, with 575,000-kw capacity is on south bank of San Joaquin River, 40 mi from San Francisco, Calif; ground water required construction of well points; structure is supported on spread footings and, in special cases, on piles; appreciable cost saving by design of cellular substructure of turbine room to permit use of big equipment and simple construction methods, and use of set of pre-used steel forms for intake tubes.
Design saves construction dollars on contra costa power plant
Civ Eng (NY)
Garbarini, E.J. (Autor:in)
1953
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Multiple prime contracting saves dollars
Online Contents | 1995
Water district: Automation saves energy, dollars
Tema Archiv | 1995
|Predictive Maintenance Saves Dollars In Philadelphia
British Library Conference Proceedings | 1998
|Bearing Replacement Saves Many Maintenance Dollars
Online Contents | 1995
Computer Assisted Peak Shaving Saves Operating Dollars
British Library Conference Proceedings | 1994
|