Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Earth forms domed roof, jacks place it atop columns
Techniques used in forming of 204-ft diam concrete dome, at Brownwood, Tex; artificial hill was built for dome form; jacking operation raised 1100-ton dome 31 ft to tops of 36 12-in. steel pipe columns anchored to 24-in. diam concrete caissons at 17-ft intervals around building perimeter.
Earth forms domed roof, jacks place it atop columns
Techniques used in forming of 204-ft diam concrete dome, at Brownwood, Tex; artificial hill was built for dome form; jacking operation raised 1100-ton dome 31 ft to tops of 36 12-in. steel pipe columns anchored to 24-in. diam concrete caissons at 17-ft intervals around building perimeter.
Earth forms domed roof, jacks place it atop columns
Construction Methods Equipment
Smith, M.L. (Autor:in)
1962
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1924
Powerful jacks raise hangar roof
Engineering Index Backfile | 1969