Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Project features in extension of upper Mississippi River, include locks and dam construction, dredging, alterations to railroad bridges and utilities, raising highway bridges, installation of navigation aides, removal of dam and improvements to existing dam; control of water levels to minimize interference to existing construction and damage to foundation material; deep seated steel sheet piling, wellpoint system and chemical grouting adopted as essential construction safety measures.
Project features in extension of upper Mississippi River, include locks and dam construction, dredging, alterations to railroad bridges and utilities, raising highway bridges, installation of navigation aides, removal of dam and improvements to existing dam; control of water levels to minimize interference to existing construction and damage to foundation material; deep seated steel sheet piling, wellpoint system and chemical grouting adopted as essential construction safety measures.
St. Anthony falls navigation project
ASCE -- Proc (J Construction Div)
Mullen, F.E. (Autor:in)
1963
18 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
St. Anthony Falls Navigation Project
ASCE | 2021
|The St. Anthony falls power plant
Engineering Index Backfile | 1898
|Chute spillway preserves St. Anthony falls
Engineering Index Backfile | 1956
|The St. Anthony falls electric transmission plant
Engineering Index Backfile | 1897
Discussion of “Blotcky on Saint Anthony Falls”
ASCE | 2021
|