Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
New 330-m quay wall was completed with 337 100-ton reinforced blocks; when filled in with sand, quay will have width of 150 m; work was done on crown of breakwater and breastworks; main mole will be extended by 100 m, giving total length of 1300 m; plans for oil tanker wharf are in hand; port equipment is also noted.
New 330-m quay wall was completed with 337 100-ton reinforced blocks; when filled in with sand, quay will have width of 150 m; work was done on crown of breakwater and breastworks; main mole will be extended by 100 m, giving total length of 1300 m; plans for oil tanker wharf are in hand; port equipment is also noted.
Port of tangier
Dock Harbour Authority
Bull, M.R. (Autor:in)
1962
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
The new port of Tangier in Morocco
Online Contents | 2006
|The durability of concretes in maritime structures. The Mediterranean Tangier commercial port
Online Contents | 2005
|DataCite | 1897
|Engineering Index Backfile | 1928
|Online Contents | 2009