Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Front-end loader and fork lift handle pile driving
Techniques of driving 55 ft long piles with only 18 ft of overhead clearance by mounting small pile driver on lift arms of crawler-type front-end loader and sinking piles in 8 ft sections and method using fork lift truck converting it to pile driver by rigging special steel frame across its lift blades are described.
Front-end loader and fork lift handle pile driving
Techniques of driving 55 ft long piles with only 18 ft of overhead clearance by mounting small pile driver on lift arms of crawler-type front-end loader and sinking piles in 8 ft sections and method using fork lift truck converting it to pile driver by rigging special steel frame across its lift blades are described.
Front-end loader and fork lift handle pile driving
Construction Methods Equipment
1963
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.