Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Barry commercial Dry dock
Renovations made during 1951 to dock constructed in 1880; principal alterations consisted of widening entrance of dock to 78 ft 6 in., re-siting and widening inner gateway to like width, and lengthening dock to 940 ft; two aspects of work are worthy of particular note: reinforced concrete framework used to reduce width of dock, and new floating caissons.
Barry commercial Dry dock
Renovations made during 1951 to dock constructed in 1880; principal alterations consisted of widening entrance of dock to 78 ft 6 in., re-siting and widening inner gateway to like width, and lengthening dock to 940 ft; two aspects of work are worthy of particular note: reinforced concrete framework used to reduce width of dock, and new floating caissons.
Barry commercial Dry dock
Engineering
Engineering ; 174
1952
3 pages
Supp Sheet
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
The Barry Dock works, including the hydraulic machinery and the mode of tipping coal
Engineering Index Backfile | 1890
|Elsevier | 2005
|Conversion of a commercial dock for use by leisure craft
British Library Conference Proceedings | 2000
|