Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Original core wall dam consisted of upstream retaining wall of rubble masonry, and downstream earth fill dam; water impounded in reservoir formed upstream of dam is used to irrigate 1,000,000 acres; raising of reservoir level by one m should irrigate another 250,000 acres; heavy leakage of core wall necessitated construction of earth fill bank on upstream face of masonry core; construction details.
Original core wall dam consisted of upstream retaining wall of rubble masonry, and downstream earth fill dam; water impounded in reservoir formed upstream of dam is used to irrigate 1,000,000 acres; raising of reservoir level by one m should irrigate another 250,000 acres; heavy leakage of core wall necessitated construction of earth fill bank on upstream face of masonry core; construction details.
Raising of sennar reservoir level
Water Water Eng
Hutchison, I. (Autor:in)
1953
7 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1927
|The Sennar dam on the Blue Nile
Engineering Index Backfile | 1924
The Sennar dam on the blue Nile
Engineering Index Backfile | 1925
Sennar dam on the Blue Nile in Egypt completed
Engineering Index Backfile | 1926
OPTIMAL OPERATION OF MULTIPURPOSE RESERVOIRS IN SERIES: ROSEIRES AND SENNAR CASE STUDY
DOAJ | 2021
|