Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Earth dam on Campbell's River, N.S.W.
2.5 mg dam was built to augment water supply of city of Bathurst; in first stage height is 90 ft; in second stage height will be increased to 114 ft; catchment area is 370 sq mi; central zone of dam section comprises disintegrated granite from borrow pit; remaining two zones will be selected from excavations for diversion culvert and spillway.
Earth dam on Campbell's River, N.S.W.
2.5 mg dam was built to augment water supply of city of Bathurst; in first stage height is 90 ft; in second stage height will be increased to 114 ft; catchment area is 370 sq mi; central zone of dam section comprises disintegrated granite from borrow pit; remaining two zones will be selected from excavations for diversion culvert and spillway.
Earth dam on Campbell's River, N.S.W.
Commonwealth Engr
1952
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Hawkesbury river high bridge, N.S.W.
Engineering Index Backfile | 1954
|Wyangala Dam on Lachlan River, N.S.W.
Engineering Index Backfile | 1933
New storage on Lachlan River, N.S.W.
Engineering Index Backfile | 1950
Elevated reservoir -- Petersham, N.S.W.
Engineering Index Backfile | 1965
Engineering Index Backfile | 1940