Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Shop building for repair of heavy equipment being constructed by Oregon Highway Dept at Salem; roof system consists of seven precast, prestressed concrete girders spaced 20 ft apart; roof slab, also precast but not prestressed, consists of panels 18 ft 7 3/4 in. long by 6 1/2 ft wide; reinforcement consists of eight cables enclosed in flexible metal sheath; prestressing was done by Freyssinet system.
Shop building for repair of heavy equipment being constructed by Oregon Highway Dept at Salem; roof system consists of seven precast, prestressed concrete girders spaced 20 ft apart; roof slab, also precast but not prestressed, consists of panels 18 ft 7 3/4 in. long by 6 1/2 ft wide; reinforcement consists of eight cables enclosed in flexible metal sheath; prestressing was done by Freyssinet system.
Oregon's first prestress job
Western Construction
Paxson, G.S. (Autor:in)
Western Construction ; 28
1953
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1915
|Oregon's Superpave Implementation
British Library Conference Proceedings | 1997
|Oregon's Measure 37 Oregon's land use planning system gets a reprieve
British Library Online Contents | 2006
|Engineering Index Backfile | 1943
|Oregon's SDWRLF gets under way
Wiley | 1998
|