Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Floating equipment chosen for river foundation work of new plant of Cincinnati Gas and Electric Co to avoid interference with adjacent construction; caisson work consisted of four hollow concrete caissons with walls from 2 1/2 to 4 ft thick and varying from 30 to 60 ft in diam; largest caisson, 30×80 ft serves as foundation for coal unloading pier and supports 207ton crane; portion of building founded on 22 8-ft 6-in. diam sheet piles driven to solid rock.
Floating equipment chosen for river foundation work of new plant of Cincinnati Gas and Electric Co to avoid interference with adjacent construction; caisson work consisted of four hollow concrete caissons with walls from 2 1/2 to 4 ft thick and varying from 30 to 60 ft in diam; largest caisson, 30×80 ft serves as foundation for coal unloading pier and supports 207ton crane; portion of building founded on 22 8-ft 6-in. diam sheet piles driven to solid rock.
Caissons support riverfront power plant
Eng News-Rec
Burtch, C.E. (Autor:in)
Engineering News-Record ; 149
1952
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Deep caissons support river-side power plant
Engineering Index Backfile | 1944
|Engineering Index Backfile | 1937
British Library Online Contents | 2007
|British Library Online Contents | 2019
|Thread - Riverfront Redevelopment
Online Contents | 2007
|